Assurances have been given that the 7500 homes will not be added to the Thanet villages but proposals have been put forward for changing the use of the poorly developed Eurokent Business Park into residential development. This would reduce the future industrial site availability in Thanet and consequently strengthen the case for China Gateway Phases 2 and 3 to be built on Greenfield sites in rural Thanet.
All this is happening on top of our drinking water supply reservoir.
We need to be extremely vigilant about the progress of this document through the various stages of consultation to ensure it is a “sound” document when finally presented to the Inspector appointed by the Secretary of State for final approval.
